QAPlus ltd

Health & Social Care: Needs Assessment Lite

This mobile working solution streamlines the assessment process in a secure and user friendly presentation. Nurses gather all the required evidence at the assessment, completing the required tool in real time.
• Health & social care assessment documents.
• Captures signatures at MDT.
• Streamlines the assessment process.

Features

  • Tablet app [secure data]
  • Not cell or wifi reliant
  • Familiar presentation [DST style etc.]
  • Patient notes, events etc. provided
  • Automatic document generation

Benefits

  • No VPN connection lag
  • Easy to use for nurses
  • Synchronises with main system automatically
  • Simple, and quick review function
  • Digitised DST, MDT etc. for paper free processing
  • Draft, review and complete assessments electronically

Pricing

£250 to £350 per user per year

  • Free trial available

Service documents

G-Cloud 11

293860527418316

QAPlus ltd

Sion Davis

+447779794154

Sion@qaplus.co.uk

Service scope

Service scope
Software add-on or extension Yes, but can also be used as a standalone service
What software services is the service an extension to The Needs Assessment app generates standard DST-style material linked to any system. In conjunction with iQA system modules it dramatically improves efficiency of initial assessment and review management. These systems include:
iChord: CHC & FNC Management
Referral Portal
Needs Assessment App
Panel Portal
Patient Choice DPS
Patient Access Home Support
Cloud deployment model
  • Public cloud
  • Private cloud
Service constraints None
System requirements
  • Web Server: Windows 2008 Server Standard Edition or above
  • Web Server: IIS Version 7.0 or above
  • Web Server Ports: 443 (SSL), 1443 (SQL Server)
  • Web Server: .Net Framework - Version 4, 4.5 or 4.6.1
  • SQL Server: Windows 2008 Server Standard Edition or above
  • SQL Server: 2008 Standard Edition or above
  • SQL Server Authentication: Mixed (SQL & Windows Authentication)
  • SQL Server: Port - 1433

User support

User support
Email or online ticketing support Email or online ticketing
Support response times SLA extract:

Faults: Potential fault evidence will be reviewed within 2 hours. Fixes are provided according to severity levels and vary between 1 day and 30 days subject to client agreement

Help: These are usually handled immediately. A more complex query relating to client configuration will be referred to a consultant within 2 hours.

RFCs (Request For Change): Your Project Manager will provide an initial cost estimate within 1 working day. If agreed in principle this is followed by a more detailed specification and accurate quote for approval and scheduling.
User can manage status and priority of support tickets Yes
Online ticketing support accessibility None or don’t know
Phone support Yes
Phone support availability 9 to 5 (UK time), Monday to Friday
Web chat support Web chat
Web chat support availability 9 to 5 (UK time), 7 days a week
Web chat support accessibility standard None or don’t know
How the web chat support is accessible Real time chat between a User and a Helpdesk Consultant, within a Web Page, using Microsoft SignalR Library
Web chat accessibility testing Not designed for assistive technology.
Onsite support Onsite support
Support levels Severity:
1. System or module down
2. System partially inoperable
3. Function cosmetic or work-around provided

Delivery Target
1: Immediate investigation, resolution within 4 hours
2: Review within 4 hours, investigation within 1 working day, resolution within 5 working days.
3. Review within 4 hours, investigation within 5 working days, resolution next client planned release [by agreement]
Support available to third parties Yes

Onboarding and offboarding

Onboarding and offboarding
Getting started Every aspect of implementation is delivered based on a Project Template that usually covers an 8 to 12 week project lifecycle. These are customised for each client but typically tasks include:

INITIATION:
Specify key contacts
Agree communications [including IG constraints]
Scope Documents [eg DST, HNA etc]
Platform Specifications [Windows tablets]
PID Agreement

CONFIGURATION:
Client config
Referral Pathways
Workflow Processes
Document master templates
User & Team Roles
Variables & Checklist approval

PLATFORM:
Server Build & Security certificates
VPN Access confirmed
Install pilot release
Confirm pilot access by Users
Tablet installs

RFCs:
Configuration - receipt organisations
System Enhancements if specified

MIGRATION:
Trial process
Go-Live planning
Live transfer documents & files
Client validation / UAT
Live Operation

TRAINING
User Lead familiarisation [WebEx or onsite]
Onsite and/or WebEx and/or video training:
Service documentation Yes
Documentation formats
  • HTML
  • PDF
  • Other
Other documentation formats Online prompts
End-of-contract data extraction Assessment and Review in progress data is transient. Once submitted for review and completed the final document and outcome is recorded.
In Progress retention is not required.
End-of-contract process As described there is no permanent record required.

Using the service

Using the service
Web browser interface Yes
Supported browsers
  • Internet Explorer 11
  • Chrome
Application to install Yes
Compatible operating systems Windows
Designed for use on mobile devices Yes
Differences between the mobile and desktop service The iChord system automatically resizes page formats [using Bootstrap] where the resolution is below the optimal 1280x1024.
API No
Customisation available Yes
Description of customisation The Portal is provided with a full set of templates that meet NHS standards - including those emerging through the NHS Digital program.

However the system is also fully customisable - particularly in relation to Workflow, document templates, consent and IG related access controls.

Documents created automatically by the system may also be edited and the final document is saved for future reference.

Scaling

Scaling
Independence of resources We provide a single version of our systems for all clients. There is therefore no conflict arising from service demands - an enhancement provided or issue resolved for one client is equally applicable to all our clients.
Distribution is achieved centrally when users sync their data tablets. Software updates are automatically loaded as required.

Analytics

Analytics
Service usage metrics No

Resellers

Resellers
Supplier type Not a reseller

Staff security

Staff security
Staff security clearance Other security clearance
Government security clearance Up to Baseline Personnel Security Standard (BPSS)

Asset protection

Asset protection
Knowledge of data storage and processing locations Yes
Data storage and processing locations United Kingdom
User control over data storage and processing locations Yes
Datacentre security standards Managed by a third party
Penetration testing frequency At least once a year
Penetration testing approach In-house
Protecting data at rest Encryption of all physical media
Data sanitisation process Yes
Data sanitisation type
  • Explicit overwriting of storage before reallocation
  • Deleted data can’t be directly accessed
Equipment disposal approach A third-party destruction service

Data importing and exporting

Data importing and exporting
Data export approach Data is submitted n 2 forms depending on systems used by the relevant CCG or Local Authority:
1. Organisations that use iQA modules will have ALL data presented directly in the main iChord system. User teams are prompted to review incoming assessments and Reviews according to set [Pathway dependent] Processes.
2. 'External' recipients can receive the data as a pdf and/or Word document with bookmarks to permit automated data extraction.
Data export formats
  • CSV
  • Other
Other data export formats
  • HTML
  • Word
Data import formats
  • CSV
  • Other
Other data import formats
  • Excel
  • HTML formatted as templates provided

Data-in-transit protection

Data-in-transit protection
Data protection between buyer and supplier networks Private network or public sector network
Data protection within supplier network IPsec or TLS VPN gateway

Availability and resilience

Availability and resilience
Guaranteed availability The Assessor app central service is hosted - either by client's own service provider or by third party hosting. SLAs for hosted platforms are defined under those terms.
However this application is fault-tolerant except for tablet hardware failure. Clients have their own equipment back-up measures to cover this.
Application faults are fixed within the terms of our annual system licence.
Severity and fix timescales are established in SLA agreed individually with clients.
Approach to resilience In-progress reviews are saved on a field-by-field, page-by page basis to enable effective restart with minimal loss of data.
On completion of reviews the data is available in source and target systems providing inbuilt resilience.
Outage reporting System Administrators can broadcast system status messages to all Users.

Identity and authentication

Identity and authentication
User authentication needed Yes
User authentication
  • Limited access network (for example PSN)
  • Dedicated link (for example VPN)
  • Username or password
Access restrictions in management interfaces and support channels Access to PID is controlled by client authentication of support connections if required.
Access restriction testing frequency At least once a year
Management access authentication
  • Dedicated link (for example VPN)
  • Username or password

Audit information for users

Audit information for users
Access to user activity audit information Users have access to real-time audit information
How long user audit data is stored for User-defined
Access to supplier activity audit information Users have access to real-time audit information
How long supplier audit data is stored for User-defined
How long system logs are stored for User-defined

Standards and certifications

Standards and certifications
ISO/IEC 27001 certification No
ISO 28000:2007 certification No
CSA STAR certification No
PCI certification No
Other security certifications Yes
Any other security certifications Data Security and Protection Toolkit (DSP)

Security governance

Security governance
Named board-level person responsible for service security Yes
Security governance certified Yes
Security governance standards Other
Other security governance standards Data Security and Protection Toolkit (DSP)
Information security policies and processes Our staff are bound by our Information Governance Policy [incorporated in supply contracts].
This is regularly reviewed - at least annually but also triggered by events such as NHS requirements. New employees receive induction training and Staff have refresh training at least annually.

Operational security

Operational security
Configuration and change management standard Supplier-defined controls
Configuration and change management approach System changes are controlled through ISO9001 approved quality controls that cover: Initiation, Realisation and Implementation.
Every RFC specification is risk assessed and graded accordingly - resulting in an appropriate test regime.
Testing is completed for each program against a specific test plan and system regression tests are completed for each new Release.
Release Notes are provided covering enhancements, fixes and test results.
Faults are recorded on Trackers that are used to highlight system functions that represent increased risk and these functions are critically reviewed by the Management Board to identify design or technical structure flaws to be resolved.
Vulnerability management type Supplier-defined controls
Vulnerability management approach Potential threats are regularly assessed by our SIRO, and security patches are applied immediately.
(All Laptops & Servers have Windows Automatic Updates configured with the "Install Updates Automatically" option.
Microsoft Security Bulletins and Sophos Alerts provide information on potential threats and vulnerabilities.
Protective monitoring type Supplier-defined controls
Protective monitoring approach Data is stored on designated secure servers and encrypted drives.
Access controls and regular security audits ensure risks are identified and mitigated immediately.
Issues are raised at the Management Board and action mandated.
Incident management type Supplier-defined controls
Incident management approach Incidents are logged and reported to the Management Board.
These are then tracked and the Management Board oversees investigation and resolution.
Processes are recorded on the Tracker system.

Secure development

Secure development
Approach to secure software development best practice Independent review of processes (for example CESG CPA Build Standard, ISO/IEC 27034, ISO/IEC 27001 or CSA CCM v3.0)

Public sector networks

Public sector networks
Connection to public sector networks Yes
Connected networks
  • NHS Network (N3)
  • Health and Social Care Network (HSCN)

Pricing

Pricing
Price £250 to £350 per user per year
Discount for educational organisations No
Free trial available Yes
Description of free trial A demonstration system is available to prospective clients subject to IPR protection and provision of consultancy and training services to ensure a viable trial is achieved.

Service documents

pdf document: Pricing document pdf document: Skills Framework for the Information Age rate card pdf document: Service definition document pdf document: Terms and conditions
Service documents
Return to top ↑